  • PACK inspection
    The main inspection contents include: charge and discharge test, insulation test, air tightness test, EOL communication test, etc.
    浏览数: 64 发布:2020-08-24
  • PACK Assembly
    The PACK assembly process mainly includes module fixing, collection harness and communication harness installation and fixing, high-voltage component fixing, BMS fixing, aerial plug and connector fixing, explosion-proof valve fixing, etc.
    浏览数: 72 发布:2020-08-24
  • Module welding
    After the module is placed in the welding fixture and fixed, the laser welding equipment uses its own visual inspection function to detect whether the welding position is accurate. After the fixture position is detected, the equipment automatically runs and welds. The equipment energy feedback system, CCD, IO control system The welding effect can be tested to ensure that there is no false welding or welding penetration.
    浏览数: 80 发布:2020-08-24
  • Sorting and matching group
    The inconsistency between the single cells often causes the battery pack to have problems such as too fast capacity decay and short life during the cycle, which eventually leads to premature failure of the battery pack. Therefore, the batteries must be sorted during the process of grouping. The battery voltage, capacity, internal resistance, etc. are measured to ensure the consistency of the battery's initial performance. In the production process, automatic sorting equipment is used to automati
    浏览数: 84 发布:2020-08-24